Announcement (read more...)

Labor Practices SI-5 students Distributed Systems. That the practice of group day Sunday, October 10, 2010 college entrance substitute twice started the first session: at 7:45 a.m. to 10:00 a.m. and the second session: at 10:00 to 12:30
Tools and equipment should be provided
1. UTP cable (already installed RJ45)
2. Type Cable Straight to switch and crossover for pc to pc
3. Switches as many as 1 piece group
4. Package Servers in the form ". VDI already installed Active Directory with the names of each person" namanobpserver.vdi
5. Master Server 2003 in the form ". VDI it was to install the AD in accordance with the name of each group. List of the attached groups
6. Virtual Software
7. XP Professional client operating system in packages ". VDI

Thank you
Lecturer